Construction Update 08/05/2019 – Loading Dock Closure 8/7
New Tower. The main activity of the past week was the preparation for a day-long session (4:30 am – 4:30 pm) of pouring concrete on Wed July 31st. The first major section to be poured was the basement-level floor slab above the mechanical room at the sub-basement level of the new tower. This area represents …